• Home
  • About Us
    • What We Do
    • Mission and Vision
    • Management Team
    • Memberships & Affiliations
    • Business Partners
    • Community & Foundations
    • Locations
  • Products
  • Disposal
  • Logistics
    • Trucking
    • Rail Operations
    • Distribution Terminals
  • Projects
  • Contact

Archives

Screened Loam

3″-5″ Screened Rip Rap

3″ Minus Screened Loam Tailings

2″ Screened Stone

3/4″ Screened Stone

© Agretech Corporation, 2022. All rights reserved

  • Home
  • About
  • Sitemap
  • Products
  • Disposal
  • Logistics
  • Projects
  • Contact Us
  • BBB
  • CDRA
  • USGBC
  • LinkedIn
  • Facebook
  • Twitter
  • Youtube
x

Agretech Ordering and Conversion Calculator

Estimate the number of cubic yards needed based on input, length and depth. This calculator helps provide approximate ordering quantities for sand, stone, loam and other materials.
Enter length and width in feet and depth in inches to calculate cubic yards of material required.
Reset Calculate
Cubic yards
Calculations of yards needed.
Approx. Tons
General conversion calculation for tons using 1.3 tons per cubic yard, per the calculation above.